Earthworks Soil Amendments, Inc. Logo
Earthworks Soil Amendments, Inc. Products for the Earth...
Stressed or Problem Trees / Vertical Mulching

Product

General Instructions for Treatment of Trees

Drill holes 12-18" deep using an earth auger (2-4" diameter) or narrow trenching shovel and fill with Establish according to the following guidelines:

A.  Newly Planted Trees

  • 24-36" Boxed Trees:
    • Drill 3 holes equally spaced in a circle just outside the rootball in the backfill area, and 5 additional holes equally spaced in a circle 12-18" further out.
  • 45-54" Boxed Trees:
    • Drill 4 holes equally spaced in the backfill area, and 7 holes equally spaced in a circle 24" further out.
  • 60-70" Boxed Trees:
    • Drill 3 holes equally spaced into the rootball, 5 holes equally spaced in a circle in the backfill area, and two small rows of holes 24" apart at an additional 5' and 7' out from the tree trunk.

____________________________________________________________________________________________________________________________________________________________

B.  Established Trees

  • 1-3" trunk diameter:
    • 3-5 holes in a circle 3' from trunk.
  • 4-6" trunk diameter:
    • 2 rows of holes 4' and 6'  from trunk.

____________________________________________________________________________________________________________________________________________________________ 

C.  Larger Trees

  • Holes 2' apart in a circle just inside dripline of the tree.

____________________________________________________________________________________________________________________________________________________________ 

D.  Specimen Tree

  • Drill holes 3-4' apart in a circle just inside dripline of the tree.

Note: Nutrients or irrigation should not be used on oak trees within 4' of the trunk.

 

Request a Quote!